Quantcast

Preparing Lock 24 for upcoming season

Crews from the New York State Canal Corporation drain water from Lock 24 in Baldwinsville on Monday. The water had leaked into the canal way during the winter while the lock was drained for maintenance purposes.

The Canal Corporation drains locks on a rotating basis to conduct necessary repairs during the off season and this year was Lock 24's turn to be maintained. Today, Lock 24 is filled with water as crews continue maintenance.

0
Vote on this Story by clicking on the Icon

Comments

Use the comment form below to begin a discussion about this content.

Sign in to comment